|
Installation of
color coating systems to correctly prepared court surfaces.
Whether new or previously coated, the court surface is evaluated
and the correct coating system designed for appropriate use. The
surface coating system may require base coatings of an asphalt or
acrylic emulsion leveling course. Then, one or two acrylic
textured (with sand ) color coats are applied for correct ball
speed and foot traction, plus one or two finish color coats.
Pavement Maintenance Contractor has 25 years of experience
applying recreational coatings and uses the most up to date
materials and processes. |